HDS designed and installed an ice and snow melting system with 4 HDS outdoor heating cables fitted to a concrete re-bar mesh before being covered with concrete and porcelain tiles.
The system is controlled by a HDS fully automatic ice and snow melting controller using temperature and moisture sensors.





