Roof installation of ice and snow melting cables

This school needed to ensure a roof top fire exit and walkway was kept sage and ice free at all times.

Project

Location

System

Construction

Size

Power

INTERESTED IN THIS PROJECT? WRITE A MESSAGE OR CALL US

 

Time on site: 1 day

An unusual project which required a roof installation of heated cables

This school needed to ensure a roof top fire exit and walkway was kept sage and ice free at all times.

Technical

HDS installed 2 heated mats controlled by air temperature and moisture sensors to ensure the fire escape is kept clear and functional. The total electrical load was just 8.5Kw (300w/sqm) and the installation was completed within a day.

The school was thrilled with this innovative solution to an important safety issue.

Shape
Shape

If you would like to talk about your requirements Leave your details and we'll be in contact soon.

Search our website...