HDS designed and installed a heating ramp system with 14 x 4455w HDS outdoor heating cables fitted to a concrete base before being covered with a specialist screed topped with a specialist carpark coating.
The system is controlled by a HDS fully automatic ice and snow melting controller using temperature and moisture sensors.





