HDS designed and installed a heated ramp system with 9 x 4455w HDS outdoor heating cables fitted to the concrete re-bar mesh, before being encapsulated in concrete.
The system is controlled by a HDS fully automatic ice and snow melting controller using temperature and moisture sensors.





